01 — Acetate
Acetate Optical Frames
Italian and Chinese cellulose acetate, cut from block, tumble-polished in six stages. Colour is matched by sheeting code — send the block number, we pull the same lot.
- MOQ300 pcs
- Tooling7 days
- Lead time65 days
Product lines
Acetate and metal run as separate production cells, with a third line dedicated to frames that combine the two. Keeping them apart is more expensive for us and better for your delivery dates.
01 — Acetate
Italian and Chinese cellulose acetate, cut from block, tumble-polished in six stages. Colour is matched by sheeting code — send the block number, we pull the same lot.
02 — Metal
Sheet metal and wire frames in stainless steel, monel and titanium. Four standard finishes — gold, rose gold, gunmetal and matte black — plated in the park's regulated zone and inspected on return.
03 — Combination
Acetate front, metal temple — or the reverse. The joint is the whole game, and it is the reason most factories decline this work.
At a glance
If you are choosing between materials rather than between suppliers, this table is the short version.
| Specification | Acetate | Metal | Combination |
|---|---|---|---|
| Minimum order | 300 pcs / model 100 per colour | 300 pcs / model 100 per colour | 300 pcs / model 100 per colour |
| Tooling lead time | 7–12 days | 10–15 days | 10–15 days |
| Sampling | 7–10 days | 20–25 days | 20–25 days |
| Bulk lead time | 65 days | 65 days | 65 days |
| Monthly capacity | 35,000 pairs | 15,000 pairs | 10,000 pairs |
| Strongest for | Colour depth, thick silhouettes, luxury positioning | Slim profiles, low weight, cost efficiency | Browlines, mixed-material collections |
| Typical end market | Mid-to-premium optical retail | Volume optical and sun | Design-led private label |
Production is 65 days for all three lines, counted from golden-sample approval. Minimum order is 300 pcs per model, of which 100 pcs is the minimum per colour. Capacity figures are confirmed with our planning team.
Not sure which line fits
Send a photo of a reference frame, a sketch, or three sentences about what you want. We will tell you which line it belongs on, what tooling it needs, and what it will cost — before you commit to anything.
Buying process
Already have a sketch?
Tooling route, price band and a realistic date — in one technical reply, within 48 hours.